Both organizations, originating and project, should learn from projects, using measurement results and analysed data from project processes and applying preventive action, corrective action and loss-prevention techniques (ISO 9004:2000, 8.5) so that present and future projects keep improving. Two groups of processes serve improvement: measurement and analysis (8.2), and corrective, preventive and loss-prevention action (8.3).
This control maps to 5 controls across 5 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 5 it maps to, and the evidence behind each claim, over MCP and REST.