The audit checks that hazardous operations are segregated, that OH&S was considered during design, that equipment has enough space for operation and maintenance, that storage tanks are adequately spaced, and that the layout allows fire equipment to move and people to reach emergency exits.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.