IEC 62443
IEC 62443-3-2:2020 security risk assessment for system design – IEC 62443

IEC 62443 ZCR 5.9: Reevaluate likelihood and impact

What does ZCR 5.9 require?

Likelihood and impact are reassessed with the existing countermeasures taken into account, giving updated ratings.

Maintained by Gerard BlokdykControl text last updated

Other controls in IEC 62443-3-2:2020 security risk assessment for system design – IEC 62443

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.