The controls are applied to the generic power system architecture and to three scenarios, substation automation, control centre to substation communication and advanced metering, with example deployments, and the report names the gaps the series had still to fill.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.