The manufacturer confirms that: the verification strategies and test procedures are suitable; system test procedures can be traced back to the software requirements; every software requirement has been tested or verified in some other way; the links between requirements and tests are recorded; and the test results satisfy the pass or fail criteria. Applies to classes A, B and C.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.