ULD operations (building up and breaking down, transport, handling and storage), whether the Operator or a provider carries them out,, follow procedures meeting the ULD Regulations, and ULDs accepted or loaded meet the safety requirements for loading and securing cargo (CGO 3.5.1, 3.5.2).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.