IACS Unified Requirements E26/E27 - Cyber Resilience of Ships and On-Board Systems
UR E27 section 3: CBS documentation – IACS Unified Requirements E26/E27 - Cyber Resilience of Ships and On-Board Systems

IACS Unified Requirements E26/E27 - Cyber Resilience of Ships and On-Board Systems E27-3.1.9: E27 3.1.9 Management of change plan

What does E27-3.1.9 require?

On request, the management of change procedure, not cyber-specific and also required by UR E22.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in UR E27 section 3: CBS documentation – IACS Unified Requirements E26/E27 - Cyber Resilience of Ships and On-Board Systems

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.