Keep company or supplier procedures for spotting and handling system anomalies and errors, and incident detection, response and recovery actions including network isolation procedures, drawing on the E26 monitoring, response plan and isolation provisions (4.3.1.2, 4.4.1.3, 4.4.3.2).
This control maps to 4 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 4 it maps to, and the evidence behind each claim, over MCP and REST.