For each category the report must describe the calculation methods, allocation methods and assumptions used; guidance asks for use profiles and product lifetimes for category 11, disposal assumptions for category 12, and the time boundary of each category.
This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.