Testing personnel are independent of the design, installation, maintenance and operation of the tested system and of the policies and procedures that guide it, and the test reports are prepared by equally independent individuals, so that results carry credibility and bias is reduced.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.