FedRAMP High
PL - Planning

FedRAMP High PL-10: Baseline Selection. Select a control baseline for the system

Baseline Selection. Select a control baseline for the system

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 17 controls across 16 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

NIST SP 800-53 Rev 5 · 2 controls

  • CPS230-24 Design and Embedding of Internal Controls

APRA CPS 234 · 1 control

  • CPS234-21 Implementation of Information Security Controls
  • SEC01-BP03 Identify and validate control objectives
  • AUCDR-IS-STEP3 Step 3 - Have and maintain an information security capability
  • ASBv3-PV-1 Define and establish secure configurations

C5 (Germany) · 1 control

  • C5-OPS-23 Managing Vulnerabilities, Malfunctions and Errors - System Hardening
  • CFTC-SS-7 Generally Accepted Standards and Best Practices

ISO 27002:2022 · 1 control

  • 5.31 Legal, statutory, regulatory and contractual requirements
  • PL-10 PL-10 Baseline Selection
  • PL-10 PL-10 Baseline Selection
  • PL-10 PL-10 Baseline Selection

PCI DSS 4.0 · 1 control

  • 12.3.2 12.3.2 Targeted risk analysis for each customized-approach requirement

SOC 2 · 1 control

  • SOC2-CC5.1 CC5.1 Selecting control activities that mitigate risk (COSO principle 10)

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in PL - Planning

You are reading one control. How much of FedRAMP High have you already done?

FedRAMP High PL-10 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of FedRAMP High your existing evidence covers. Hold C5 (Germany) and 119 of 410 FedRAMP High controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 6 were rejected on the C5 (Germany) pair alone.

Query this from an agent

The graph holds this control, the 17 it maps to, and the evidence behind each claim, over MCP and REST.