FedRAMP High
AU - Audit and Accountability

FedRAMP High AU-7(1): Automatic Processing

Process audit records for events of interest based on defined criteria.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 21 controls across 14 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

CIS Controls v8 · 4 controls

PCI DSS 4.0 · 4 controls

  • 10.2.1 10.2.1 Audit logging enabled on all system components
  • 10.3.3 10.3.3 Audit logs promptly backed up to central secure storage
  • 10.4.1 10.4.1 Daily review of security-relevant logs
  • 10.4.1.1 10.4.1.1 Automated mechanisms used for audit log review

NIST SP 800-53 Rev 5 · 2 controls

  • NIST800-AU-6 AU-6 Audit Record Review, Analysis, and Reporting
  • NIST800-AU-7 AU-7 Audit Record Reduction and Report Generation
  • SEC04-BP02 Capture logs, findings, and metrics in standardized locations

CMMC 2.0 · 1 control

ISO 27001:2022 · 1 control

  • 8.16 Monitoring activities

ISO 27002:2022 · 1 control

  • 8.16 Monitoring activities
  • NIST-CSF-DE.AE-02 Potentially adverse events are analyzed to better understand associated activities
  • 03.03.06 Audit Record Reduction and Report Generation

NIST SP 800-172 · 1 control

  • 3.11.3e Advanced Automation and Analytics Capabilities
  • AU-7(1) AU-7(1) Audit Record Reduction and Report Generation | Automatic Processing
  • AU-7(1) AU-7(1) Audit Record Reduction and Report Generation | Automatic Processing

SOC 2 · 1 control

  • SOC2-CC7.1 CC7.1 Detecting configuration changes and new vulnerabilities

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in AU - Audit and Accountability

You are reading one control. How much of FedRAMP High have you already done?

FedRAMP High AU-7(1) is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of FedRAMP High your existing evidence covers. Hold C5 (Germany) and 119 of 410 FedRAMP High controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 6 were rejected on the C5 (Germany) pair alone.

Query this from an agent

The graph holds this control, the 21 it maps to, and the evidence behind each claim, over MCP and REST.