Article 3 requires each Member State to establish a National Building Renovation Plan (NBRP) by 31 December 2025 (with the first plan covering the period to 2050) and every 5 years thereafter. The NBRP sets the trajectory to decarbonise the national building stock by 2050, includes evidence-based targets, instruments and milestones, and is integrated with the National Energy and Climate Plan (NECP) under Regulation (EU) 2018/1999. NBRPs are consulted with stakeholders and published.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.