Article 10 requires Member States to ensure the deployment of suitable solar energy installations on the following buildings (where technically suitable and economically feasible): new public + non-residential buildings with useful floor area over 250 m2 from 31 December 2026; all existing public buildings with useful floor area over 2,000 m2 / 750 m2 / 250 m2 by 31 December 2027 / 2028 / 2030; covered car parks adjacent to buildings from 31 December 2027; all new residential buildings from 31 December 2029; non-residential buildings undergoing major renovation from 31 December 2027.