ENISA Data Protection Engineering - From Theory to Practice
ENISA DPE - Engineering Data Protection

ENISA Data Protection Engineering - From Theory to Practice ENISA-DPE-2.2: Connection with the Data Protection Impact Assessment

Engineering decisions on PETs and other measures should be informed by, and feed back into, the Data Protection Impact Assessment (DPIA): identified high-risk processing drives the engineering measures, and the implemented measures reduce the residual risks recorded in the DPIA.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ENISA DPE - Engineering Data Protection

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.