EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS
EN 50128 Annex A: Criteria for the selection of techniques and measures – EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS

EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS 50128:A.6: Table A.6: integration (7.3 and 7.6)

Table A.6 lists the integration techniques: functional (black-box) testing (per Table A.14) HR at every SIL including Basic Integrity, and performance testing (Table A.18) R at SIL 1 and 2 and HR at SIL 3 and 4.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A.6 Table A.6: software integration analysis and testing (7.3 and 7.6)

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in EN 50128 Annex A: Criteria for the selection of techniques and measures – EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.