OV-6b must model the selected resources whose states matter, the activities that change them, physical and temporal measures, before-after relationships linking activities and successive resource states, and the information resources describing applicable rules and conditions. The activities and resources shown must be a subset of those in the matching OV-5b.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.