Quality assurance obtains assurance that each process's transition criteria are satisfied before moving on. Table A-9 objective 4, described in 8.1.c; applies at levels A, B, C, independence required at levels A, B, C; activities 8.2.e, 8.2.h, 8.2.i; outputs SQA Records.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.