The architecture conforms to the design standards, deviations justified. Table A-4 objective 12, described in 6.3.3.e; applies at levels A, B, C, no independence required; activities 6.3.3; outputs Software Verification Results.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.