DO-178C / ED-12C - Software Considerations in Airborne Systems
Table A-3: Verification of outputs of software requirements process – DO-178C / ED-12C - Software Considerations in Airborne Systems

DO-178C / ED-12C - Software Considerations in Airborne Systems A-3.5: High-level requirements follow the requirements standards

The high-level requirements were written in line with the project's requirements standards, and deviations are justified. Table A-3 objective 5, described in 6.3.1.e; applies at levels A, B, C, no independence required; activities 6.3.1; outputs Software Verification Results.

Maintained by Gerard BlokdykControl text last updated

Other controls in Table A-3: Verification of outputs of software requirements process – DO-178C / ED-12C - Software Considerations in Airborne Systems

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.