The high-level requirements were written in line with the project's requirements standards, and deviations are justified. Table A-3 objective 5, described in 6.3.1.e; applies at levels A, B, C, no independence required; activities 6.3.1; outputs Software Verification Results.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.