Requires that environmental assessments and authorisations for Strategic Projects are conducted in a coordinated and time-bound manner, integrating EIA and related procedures without lowering environmental protection.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.