Critical Infrastructure Risk Management Program (CIRMP) Rules 2023
Part 1: Application, asset classes, enhanced classes and grace periods – Critical Infrastructure Risk Management Program (CIRMP) Rules 2023

Critical Infrastructure Risk Management Program (CIRMP) Rules 2023 4(4): s 4(4) Compliance through another Part 2A instrument for an entity holding assets under two instruments

What does 4(4) require?

Part 2 of the Rules does not apply to a CIRMP Rule asset that is not an enhanced-class asset where its responsible entity is also the responsible entity for an asset specified in another Part 2A instrument, its CIRMP for the Rule asset complies with that other instrument's s 30AH(1)(c) requirements as if they related to the Rule asset, and the entity complies with that instrument's s 30AKA requirements likewise; an entity holding an enhanced-class asset and an asset under another instrument applies Part 2 of these Rules to the enhanced asset and the other instrument to the other.

Maintained by Gerard BlokdykControl text last updated

Other controls in Part 1: Application, asset classes, enhanced classes and grace periods – Critical Infrastructure Risk Management Program (CIRMP) Rules 2023

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.