A site still under construction needs a workable way for its own workers, and then the brigade, to attack a fire before the building is finished, scaled to the hazard on site and how high construction has climbed so far (E1P5).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.