A worker carrying out construction work keeps his or her general construction induction training card (or, while an application is pending, the certification) available for inspection, unless it is lost and a replacement has been applied for; returns it as required by a cancellation notice; and does not intentionally or recklessly alter it.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.