ASIS SPC.1-2009 - Organizational Resilience Standard 4.5.5: 4.5.5 Planned internal audits by objective auditors with follow-up verification

The organization must hold internal audits on a planned cycle, and now and then outside it, to find out whether its control objectives, controls, processes and procedures meet the Standard and the relevant law, meet its own risk management requirements, are properly put in place and kept up, and work as intended. The audit programme must take account of how important and how mature the processes are and what earlier audits found; set the criteria, scope, frequency and methods; keep audits objective and impartial, no auditor checking their own work; set out responsibilities and reporting in a written procedure; and require the management concerned to remove any nonconformity found, and its cause, without undue delay, with follow-up checks reported.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A.8.5 A.8.5 Internal audit of the PAPMS

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.