API 1164
Detect (DE): anomalies and events, continuous monitoring, detection processes (Section 8) – API 1164

API 1164 DE.DP-3: Periodic testing of the design and operating effectiveness of technical and procedural detection controls

What does DE.DP-3 require?

The plan must require periodic testing of the design effectiveness and the operating effectiveness of both technical and procedural controls used by the monitoring program's detection mechanisms.

Maintained by Gerard BlokdykControl text last updated

Other controls in Detect (DE): anomalies and events, continuous monitoring, detection processes (Section 8) – API 1164

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.